Machine Vision Feasibility Evaluation Checklist
Confirm optics, sample variation, cycle budget, and PLC handshake requirements before project kickoff.
1. Define the pass/fail acceptance boundary
Separate critical defects from cosmetic variations before tuning algorithms. Gather both representative OK parts and genuine NG examples covering worst-case glare, surface marks, and part tolerances.
2. Verify optics, working distance, and lighting
Confirm minimum feature size per pixel across the field of view. Fixed lighting geometry and mechanical fixturing prevent downstream threshold fragility far better than post-processing alone.
3. Measure processing and trigger budget
Check exposure time, readout latency, workflow node cost, and PLC handshake turnaround together on the target workstation or IPC hardware.
4. Clarify station control & rollback expectations
Document who approves parameter updates, what happens when the line is running, and which snapshot revision acts as the baseline fallback.